Legal Notice (Impressum)

Version 1.6 – Last updated: September 10, 2026

In accordance with § 5 DDG (Digitale-Dienste-Gesetz) (formerly TMG)

Service Provider Information

Simon Schwer
Wolfringstraße 14
90765 Fürth, Germany

Email: info@tensorpm.com

Tax number: 218/272/71052 (Finanzamt Fürth)

Responsible for Content

According to Section 55 (2) of the German State Media Treaty (Medienstaatsvertrag, MStV):

Simon Schwer
Wolfringstraße 14
90765 Fürth, Germany

Dispute Resolution

We are not willing or obligated to participate in dispute resolution proceedings before a consumer arbitration board.

Disclaimer

Liability for Content

As a service provider, we are responsible for our own content on these pages in accordance with Section 7 (1) of the German Telemedia Act (TMG) and general laws. According to Sections 8 to 10 TMG, however, we are not obligated to monitor transmitted or stored third-party information or to investigate circumstances indicating illegal activity. Obligations to remove or block the use of information under general laws remain unaffected. Liability in this regard, however, is only possible from the time of knowledge of a specific infringement. Upon becoming aware of such legal violations, we will remove this content immediately.

Liability for Links

Our website contains links to external third-party websites, over whose content we have no influence. Therefore, we cannot assume any liability for this external content. The respective provider or operator of the linked sites is always responsible for the content. The linked sites were checked for possible legal violations at the time of linking. Illegal content was not recognizable at the time of linking. However, continuous monitoring of the linked pages is not reasonable without concrete evidence of an infringement. Upon becoming aware of legal violations, we will remove such links immediately.

Copyright

The content and works created by the site operators on these pages are subject to German copyright law. Duplication, processing, distribution, or any form of commercialization beyond the scope of copyright law require the prior written consent of the respective author or creator. Downloads and copies of this site are only permitted for private, non-commercial use. Insofar as the content on this site was not created by the operator, the copyrights of third parties are respected. In particular, third-party content is identified as such. If you become aware of a copyright infringement, please inform us accordingly. Upon becoming aware of legal violations, we will remove such content immediately.

Image Credits and Licenses

Icons used on this website are provided by Icons8 and are used under their license terms. The trademarks Windows, macOS, and Linux are the property of their respective owners.

Data Protection

Information about the processing of personal data can be found in our Privacy Statement at: ./privacy

Technical Contact

For technical support and inquiries:
Email: info@tensorpm.com

Service Providers

Our website is hosted on servers provided by Hetzner Online GmbH in Nuremberg, Germany. Our domain is registered with INWX GmbH & Co. KG in Berlin, Germany.

The TensorPM software uses the following service providers:

  • SendGrid (for authentication emails)
  • Stripe (for payment processing)
  • Fireworks AI, Inc. (active default for AI services in subscription mode – hosts the DeepSeek V4.1 Flash open-weight model on Fireworks' own infrastructure; DeepSeek, the model's developer, is not in the data path)
  • Google Cloud / Vertex AI (processes image/vision requests and provides the configured text fallback in subscription mode – hosts the Gemini 3.7 Flash model)
  • Optional Business BYOK providers (for AI services in Business BYOK mode, e.g. OpenAI, Anthropic, or others configured by you)

Our server infrastructure for the subscription service is hosted by Hetzner Online GmbH in Germany.

Updates to this Legal Notice

This Legal Notice may be updated from time to time. Each updated version will include a revision date at the top of the document.


Version: 1.6 Last updated: September 10, 2026